Eyrie Pavilion Process

  • katrinegramstad
  • Jan 8, 2015
  • 1 min read

This is a very short post about the building process. We were drawing and designing almost two weeks while we stayed at the KVK farm. So this building was almost buildt in only two weeks, with materials as bricks, over 3 km bamboo and granite.

We where aslo taking time laps along the building process. Peder Gaare and Oliver T. Edwards put some Go Pro's up at the site and Oliver made this video and published on Vimeo:

IMG_0464.jpg

The column is done, and out from this, we are working with a weaving technique, where we are connecting eight splitted bamboo sticks to the column.

prosess2.jpg

prosess4.jpg

cocoon6.jpg

Photo taken by Leif Hansen

After we were done with the structure, we had to fix every point of the building with thread and then we fastened the shingles.

prosess3.jpg

prosess5.jpg

This was as far we got in the building process, because we had to go back for christmas...

But fortunatley our co-workers managed to finish the shingles and the flooring.

And here is the handwash for the toilet that I got to design. I am hoping it will grow pretty with the time.

prosess1.jpg


 
 
 